Renovation

Fire-Damaged Industrial Greenhouse Renovation — 16 × 40 m (640 m²)

Norhage Industri executed a complete structural restoration and modernization of a fire-damaged 640 m2 industrial greenhouse in Mellanå. Our engineering team restored structural integrity, upgraded the thermal envelope, and modernized ventilation controls to safely return the facility to full commercial production.

Project Facts
Type Renovation
Country Sweden
Location Mellanå
Year 2026
Size / Scale 16 × 40 m (640 m²)
Industry Horticulture

Scope of Work

  • Damage Audit & Selective Demolition: Conducted a comprehensive heat-and-fire structural assessment, safely dismantling damaged polycarbonate, degraded wall sections, and vent mechanisms.

  • Engineering & Structural Reinforcement:

    • Excavated foundations along the gable end for structural access and framework rebuilding.

    • Reinforced main vertical load-bearing columns and rebuilt damaged wall sections using 60x60mm aluminium profiles.

    • Repaired and strengthened beam-to-wall load connections while preserving non-damaged structural members to minimize CapEx.

  • Cladding & Thermal Envelope Upgrade:

    • Reclad roof, walls, and vents with high-insulation 16mm multiwall polycarbonate panels, custom flashings, and weather-tight seals.

    • Installed a heavy-duty industrial main gate and a glazed service access door per client specifications.

  • Ventilation Modernization & Control:

    • Serviced roof vent drive motors, overhauled gear mechanisms, and installed a modern control box for automated temperature and safety response.

  • Commissioning & Handover: Conducted full system operational testing, leak checks, and safety adjustments for immediate production reuse.