Assembly
Reo Industrial Greenhouse Installation — 25 × 90 m (2,250 m²)
Norhage Industri completed the end-to-end installation and full commissioning of a 2250 m2 Reo industrial greenhouse facility. We managed every phase from ground setup to final automation calibration, handing over a complete, turnkey production environment optimized for immediate commercial cultivation.
| Type | Assembly |
|---|---|
| Country | Sweden |
| Location | Mellanå |
| Year | 2026 |
| Size / Scale | 25 × 90 m (2,250 m²) |
| Industry | Horticulture |
Scope of Work
-
Structural Assembly & Framework: Assembled heavy-duty reinforced arches, end-wall supports, and load-bearing stabilization systems engineered for high-capacity crop loads.
-
Thermal Envelope & Cladding: Installed precision-tensioned double-layer plastic film to eliminate air leakage, ensure thermal stability, and reduce heating energy demand.
-
Automated Ventilation Setup: Installed top and side-opening mechanisms driven by industrial gear motors for rapid, automated humidity and airflow management.
-
Climate & Heating System Integration: Connected building-scale heating loops and an overhead air-circulation fan network to ensure uniform temperature across all growing bays.
-
Irrigation & Automation Calibration: Installed high-efficiency irrigation booms and pipe networks, syncing all hardware to a central weather station and sensor hub for automated environmental control.